Download
You can download here documents issued as part of the Green Line project.
Adobe Acrobat Reader ® is required to open these documents. It can be free downloaded on Adobe.com.
Consultation phase 1
A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Questionnaire
Consultation phase 1

Final report of Consultation phase 1
(key facts, results and main feedback)
Consultation phase 2
A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Questionnaire
Consultation phase 2

Final report of Consultation phase 2
(key facts, results and main feedback)
Consultation phase 3
A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Questionnaire
Consultation phase 3
Other documents

The Green Line route
From Moadamiyeh to Qaboun, the Green Line will serve major points of Damascus.

Time-Schedule
The new Metro line is expected to open in 2016.

Damascus future Metro network
Feasibility studies carried out in 2002 recommend a four-line Metro network.