Download

You can download here documents issued as part of the Green Line project.
Adobe Acrobat Reader ® is required to open these documents. It can be free downloaded on Adobe.com.


Consultation phase 1

A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Brochure
Brochure
Consultation phase 1

Questionnaire
Questionnaire
Consultation phase 1

Final report of Consultation phase 1
Final report of Consultation phase 1
(key facts, results and main feedback)


Consultation phase 2

A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Brochure
Brochure
Consultation phase 2

Questionnaire
Questionnaire
Consultation phase 2

Final report of Consultation phase 2
Final report of Consultation phase 2
(key facts, results and main feedback)


Consultation phase 3

A brochure and a questionnaire have been dispatched within Damascus as part of the Green Line consultation process.

Brochure
Brochure
Consultation phase 3

Questionnaire
Questionnaire
Consultation phase 3


Other documents

Green Line route
The Green Line route
From Moadamiyeh to Qaboun, the Green Line will serve major points of Damascus.

Time-schedule
Time-Schedule
The new Metro line is expected to open in 2016.

Damascus future Metro network
Damascus future Metro network
Feasibility studies carried out in 2002 recommend a four-line Metro network.